Tuesday 27 June 2017

Lewis Lake - St. Leonard's Yard Track complete

More Track laying last night, I managed to finish off the Yard Track,  Hopefully you can see from the picture to the side i have marked up each track.

Working from Left to right
First track is the Caboose Track, I still have a line to take down towards bottom and add in 2 more points will will take you to the Switcher Sidings and Fueling Stage.
The Next 3 are Storage Sidings for Rolling Stock.
When you come of the Helix and the Train is ready to be broken down they will the come into the Drop Off/ Set Down Sidings to be sort and either put away or moved on to there destination.  This will also be where new Trains are formed ready to be taken away.
The Last line shown is the Main Line, which runs straight through the yard.

To the left of the main line there will be 2 lines installed, these will be Holding lines, once the departing train has been formed up, it will be moved to these lines, ready to be collected by the main loco and taken off for Delivery to which ever Industry they are being sent to.  I have now ran out of Ground Throws and also need a few more points to be able to finish off the bottom level, but its not far away.