Friday 23 June 2017

Lewis Lake - Update to the Track Laying

Update on the Progress made so far.


Helix is now complete track wise, i just need to sort the wiring out 


The low level run around now has been fully laid, with the 2 sidings in place,  
Just need to tidy up the wiring


I finally have a clear work space, i plan to put a few shelves between the the 2 levels of base board, to hold paints and tools.



I managed to make a start on the point work that runs across the with as you come out of the yard




All the point work is now installed across the window on the bottom level, the box of drawers will move, and the siding the comes off here will run down to the turntable and roundhouse



I also made a start on the ladder track for the yard.  The Peco code 83 points have two long ties which would foul the track com off onto the yard, to i had to cut them back and swap them to the other side, so i could sit the Ground Throws in place.