Showing posts with label Layout planning. Show all posts
Showing posts with label Layout planning. Show all posts

Thursday, 22 June 2017

Walthers 130' Turntable with DCC

Its been a busy few weeks,  I have been off to see Gun's N Roses in London and trying to clean the Layout room, so i can get the yard track down.

I have bought myself this Turntable for the Roundhouse, Since i now know i can run Challengers around the layout, this will let me turn them. 


I got it at an Amazing Price,  I bought the Walthers Book, which had a 20% off any single Cornerstone product, which made a nice dent in the price of this.


I just need to start picking up the Roundhouse stalls, so i can set everything out

Saturday, 27 May 2017

Baseboard Construction



A full Saturday building the next few levels up.  Second level is complete accept for the lift out sections at the door.

I have also build the Top main baseboard framing.  I will leave the boards off until i get the track laid below, to leave myself good access.




Friday, 26 May 2017

Lewis Lake Track Plan Level 1, 2 & 3

Having left St. Leonard Yard on the bottom level, 3 turns of the Helix brings you to this Run around level,  this is just to add running length to the Trains.  The Train comes off and past the door, rising the last 75mm (3inch) to meet the Helix at the next level.  This reduces the need for points.

On this level we have the main line running through the middle of 2 Long Storage sidings.  As i have no off layout Storage i needed to create as much as possible on the layout without it looking.  So from these siding you head back onto the Helix to Head up.



I am Planning to have the layout looking like its build within the Mountains,  With Lewis Lake in Yellowstone park, i feel i can achieve this.  The Second level is again a single run around to add length.  The level will sneak in and out of the mountains, with a few Tunnels and Bridges.and back on to the helix to reach the final level.

This will be the main switching level, and will be operated by standing, and in some peoples case standing on a box.....   I plan for at least three Industries on this level, as you come off the Helix you pass West Loanhead Coal Mine, which will be built off the Mountain side.  Moving Round to Caledonian  Distillery (My Grandfather worked in this Distillery in Edinburgh for over 40 years)  plus who does not like a beer.  As you move around to sit above the Roundhouse and Helix, East Roslin Steel & Wire Works will be the main Industry here,  I plan to have this sitting on a Dock front with a Ship on the quayside.  I hope to add another Industry in this Area, but i want to see how much room the steelworks up, and what space i have left,  Following the Back road onto the Helix and coming all the way down on the inside to the St. Leonard Yard on the bottom level, complete the loop.
I feel with the space i have this was the best use of it and will give me room to have trains running and Switching options.

I think 3 people would be able to operated ok and have space to move about and be able to sit,  we could have 4 but one would need to be in the Helix.

As is pay day i have managed to pick up some timber, so hope to have the a load more base boards built over the weekend


Wednesday, 24 May 2017

Lewis Lake - Base Level Track Plan


It took some working out, but i seem to have managed it.

Here is my track plan for the base level of Lewis Lakes,  I drew it out using AutoCAD and managed to covert it into a picture so i can post it here.  I managed to find Scale Drawings of all Peco Code 83 points, so i reproduced then as CAD blocks that i could use in the Track Design.  Using AutoCAD also allowed my to Design the Helix and the curves to achieve the correct radius.

This is the base level of the Layout and the Start of my Trains Journey.  Trains will be built up in St Leonard Yard, with the ladder tracks holding my Rolling stock and cabooses.  There is Space to build  2no. 20 car trains here, which can the be taken around the layout on the outside line and stored in the two Holding lines at the back of the yard, which can only be accessed from the outside line.  As the Train leaves the yard it will pass my Workbench and onto the Helix running up the Outside line to the Industries that are on the very top level.
When i am running a operating session, of which i have room for 3 people, (4 is someone want to switch the Steelworks)  Each person will be allocated a Shed number form the round house, the loco in the stall will be theirs to operated for the day.  then give a Card Switch list to go and build there Train from the bottom yard, each car will the have a destination to be delivered.  This is how i hope it works anyway.  two Operators are able to work the bottom yard, with the other working the Steelworks or one of the other Industries on the top deck.  There is also the scope if i am working away in the shed, to just switch a train on and let it run around.

When i designed the layout i wanted space for a little Switching and have a few friends over to operated, but also just be able to let the locos run.  I wanted to do my best to fit a Large Turntable in and as big a round house is possible.   Due to the limited space i have, I had to drop the round house board down, so i could sneak it under the Helix.  When looking at it, the Sheds will look like they have been build into the side of the mountain, but i was will to accept this.

When running up the Helix, you have no option but to come off at each level and run around the shed, this saved me from having any points in the Helix and adds running length to the trains.  When you reach top the helix runs from top to bottom and you finish up at the top of the yard, ready to switch you train around.

There is no much space for Builds and Structures on this level as i wanted to have as much Storage space as possible for my Rolling stock.  At the top of the yard there will be a small Platform/Loading Dock and there will be a few other structures dotted about.
   

Friday, 19 May 2017

Helix Design and Building

 Helix Design

I have a minimum radius of 26 Inchs on my layout, so i made sure this followed into the helix.

I used AutoCAD a computer drafting package to aid with the Design of the curves and the templates.  for the Supports i used 12mm threaded rod, i would have preferred to have used 10mm, but the company i work for had 12mm laying around so i was not going to complain.

The Bed is made from 12mm chipboard which is cheap and strong enough to span the gap.  The bed is 175mm  (7inch) wide.
The reason i used screwed rod was the ease to adjust the height of the bed at each level, by just turning the nuts.  And it does drive you nuts screwing down each one to the correct level from the top.  I worked out turning them in pairs was the best way, as the bottom one clamped the board in place and the second became the support for the one above.




I started by building the first turn and setting out the rod points by widening the board where the rods would be fixed, so as not to affect the clearance of the loco and rolling stock.  I used the first turn as a template for the next six levels, and it has worked very well.


Once the first turn was in i laid the track and added droppers for power,  I solider each length of Flexi track once in place. Once i have full tested the complete helix i plan to use white glue watered down to complete the fixing, then add a few cuts to allow for expansion


This pictures show the entrance ramp from the yard onto the Helix,  the back line is a run around, to allow access to the back of the yard, and the holding sidings.

 The Rods are about 2 inches longer than they need to be, so will be cut down where needed

On the third loop the track comes off for a run around with two large sidings to hold Loco's, you can just see the off track on the right hand side. This track comes back on at the fourth loop, so i need to make the 75mm height different up before i get to the Helix

















The outside track is my Up track to take me to each level, coming on and off where needed, You can not go from the bottom to the top on the outside track is it forces you to come off at each level.  The inside line comes from the top all the way down to the bottom into the yard.  This took away the need for any points on the helix,  there is also no way two trains can meet going opposite directions, so should help greatly with operation.

This is how my Helix stands just now.  I have a loop and a half until its finished and i will have reached my top level.

The last picture on the Left shows where you come off the Helix into the Yard, the Wifes soup tins come in very handy.

I am very pleased with the progress so far and have to thank David Ross for the help with the Design and setting up.

This weekend should see the Helix finished so will update again on Monday



Tuesday, 2 May 2017

New Track plan

New Track Plan

Its fair to say i change my mind alot, worse then a woman i have heard before.

So with that in mind, I have stopped all my On30 Layout Building took all my stuff and Sold it to Mac's Models, for a very good price.



As mentioned before i have a 4m x 3.5m Shed in the Back garden, which i have full power lighting and heating,  after what seemed like an all to easy chat with my wife, i was given full permission to built a Static layout in there so i can play trains.




Over the past year i have been planning my New HO American layout, by drawing it up in AutoCAD.

The main things i wanted was:-

Long Runs

Roudhouse and turntable.

Mountians

And a little switching

Which i am please to say i have managed to get all in and a little extra.

The layout will have a Helix in one corner and 4 running levels around the shed.

Level 1, will have a yard the full length of the back wall allowing for the biggest train i plan to run (Big Boy and 20 boxcars) to be stored.  I will also have my Roundhouse and turn table at this level , the round house sneaking under the Helix.

Level 2 will be a run around to add running length, this will sit about 5 inches above the main yard and will hug the wall.

Level 3 will also be a run around the will sit about 6 inches below the top finished level, this i plan to snake in and out, with the Track running along a river edge, disappearing in and out of tunnels.

Level 4 will be my top level and will hold all my industries,  So far i plan to have a Distillery, Steelworks and a Coal Mine, this will allow me to take the rolling stock from the yard at the bottom level and do a little switching.

I have also designed the track plan to allow for trains just to run, when i am not wanting to operate.



 So the Construction work begins :-)


Saturday, 25 June 2016

Track Laying and Point Wiring


I am off to Perth Model Railway Show tomorrow....

I can't believe it was a year ago at this show that i bought the first lengths of track and the points i am now just getting around to fitting.
Talk about slow progress...


 Well a lot has been happening over the past few weeks,  i have a lot of the papermashie base on, and i have now finally started to lay track and fit points.

I had some help working out the wiring as this is my least favorite part of the whole model railway experience.  But i now have a very easy to follow wiring diagram and a colour system to follow.


 Over the past few days i have managed to fit 2 points, The first on the bottom of the layout at the back.  With will be my take off/put on track.  and because i am using the ECOS system it will also be my Programming track.  This will be the only point on the layout that is under the layout, with the rest being placed directly under the point.  This part of the layout was not on the original track plan, and was added only when i came to lay the track in this area.


The Second point i have fitted Takes you from the main loop up to the big white hole, which will become my Turntable pit.  I have fitted a clear piece of plastic card between the point motor and point, this will allow me to ballast around the point with out fear of affecting the motor.

There is quite a few gaps between the rails where i have soldered the droppers to the underside of the rails.  once i have played with the trains for a while or to give its official name 'test run'  i will add these in where needed.

I have a small shopping list of urgently required items for tomorrow, a right hand point, ballast mix, and some coloured wire.  I am also hoping to pick up some people and bits of scenic's but i shall see how things work out.

Anyway i am very happy with the Progress so far,  it seems to be moving along well.

Thursday, 16 June 2016

Yes that Is Track you See........ (Track Laying)



Well i took the leap, i have been putting this off for ages scared i might make a mess of it.  But finally the first 2 lengths of Track are down.

I now have all the Landscape base in place, and before i could do much more i needed to have the track laid where it will disappear into the Tunnel.

I drilled two holes in the baseboard to drop the wires through, and soldiered the wires to the underside of the rails.

Once i have  the ground cover and ballast in place these will not be seen at all.

I laid the Track using PVA (white glue) on to the cork base.  Using Panel pins to help hold the track in position and weighted it down with anything i could find. (My drill, some spray cans and a bottle of Limeade..)



                                                                              At both ends of the track will be a point so that is the next stage for me,  I need to look out the wiring diagrams  for the point motors also. once i am happy with the track position i will add the extra sleeps in to close the gaps up.  

I hooked up my Roco DCC system as a tester to see if things ran ok, and put my Little Porter on with a few Wagons to see how it would hand the curves and the slope.  The Porter had no problems but i think my Forney might struggle,  The Layout has been Designed to run Porters only, but i was looking for an option with the other types.  I will give it a run later to see if it will work, It might mean i need to tweek the track a little, but i would be worth it.  If i can't get the radius of the curves to work, It just means i will have to built another layout to run it......

So this is the first Video on my Porter Running up and down the track ;-)  No holding me back now.


Thursday, 11 June 2015

Track Planning


This is a good post, a very good post.  After a long time landscaping and building real buildings i get to post about my track plan.

I have had an idea for years, to build a small On30 mining layout about 4 foot square, after i found these pictures online.  I liked the idea of a small layout and the fact you can have a run round, which is handy at shows if you are speaking to people, you can still have something moving. 



This layout is only 3 foot square, and uses woodland scenic risers to achieve the height to take the track above the lower level.  I am hoping if i open the layout out to 4 foot square i can get a bigger radius to allow me to use shay's or climax loco's along with the porters.  
I am also going to make it look like is on an out crop into the lake, and build a small dock so the mined materials can be shipped to the local small town.  This gives the loco's somewhere to come from and go too.

On the top Plato i will place the mine and workshop/mining camp, along with the turntable, and lots of lights and moving parts.



The main loco stock will be porters like these, but the climax and shay loco's by bachmann are just to nice, to not have running on the layout also.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

The Workshop

I have now installed 2 of the shelving units, with a 3rd to be placed next to the left hand side unit.  i have picked up today the last 2 bits of worktop.  I also have 2 base units 1no. 600mm and 1no. 1000mm. to built to sit under the island worktop, That will leave my with just 2 1000mm base units to finish the storage area.   I now have a nice Purple colour on the walls.......  left over paint from the Kitchen, how clean it will stay i have no idea..





Wednesday, 10 December 2014

So why Lewis Lake and where it is

So why Lewis Lake is easy to answer, My Son is called Lewis, and i wanted the layout to be close to water, so after a bit of googling i found Lewis Lake in Wyoming, which fitted the bill perfectly, So here's a bit about the place.

Lewis Lake is located in the U. S. state of Wyoming in the southern part of Yellowstone National Park, about 4 miles (6.4 km) southeast of Shoshone Lake, and approximately 10 miles (16 km) southwest of Yellowstone Lake. Lewis Lake and Shoshone Lake are both located a few miles northeast of the Pitchstone Plateau.

The Lewis River is the lake's primary inflow, draining south from Shoshone Lake. The primary outflow of Lewis Lake is also the Lewis River, continuing south to join the Snake River near the southern boundary of Yellowstone National Park. A few small creeks also feed Lewis Lake. There are several hot springs emptying into the lake on its northwestern shore and two more hot springs at the lake's southern end where it empties into the Lewis River. A campground is located on the lake's southeast shore. Yellowstone National Park's South Entrance Road (which is also numbered as U.S. Route 287, U.S. Route 89, and U.S. Route 191), run along the east side of Lewis Lake.

Like the river, Lewis Lake is named for Meriweather Lewis, commander of the Lewis and Clark Expedition.