New Track Plan
Its fair to say i change my mind alot, worse then a woman i have heard before.
So with that in mind, I have stopped all my On30 Layout Building took all my stuff and Sold it to Mac's Models, for a very good price.
As mentioned before i have a 4m x 3.5m Shed in the Back garden, which i have full power lighting and heating, after what seemed like an all to easy chat with my wife, i was given full permission to built a Static layout in there so i can play trains.
Over the past year i have been planning my New HO American layout, by drawing it up in AutoCAD.
The main things i wanted was:-
Long Runs
Roudhouse and turntable.
Mountians
And a little switching
Which i am please to say i have managed to get all in and a little extra.
The layout will have a Helix in one corner and 4 running levels around the shed.
Level 1, will have a yard the full length of the back wall allowing for the biggest train i plan to run (Big Boy and 20 boxcars) to be stored. I will also have my Roundhouse and turn table at this level , the round house sneaking under the Helix.
Level 2 will be a run around to add running length, this will sit about 5 inches above the main yard and will hug the wall.
Level 3 will also be a run around the will sit about 6 inches below the top finished level, this i plan to snake in and out, with the Track running along a river edge, disappearing in and out of tunnels.
Level 4 will be my top level and will hold all my industries, So far i plan to have a Distillery, Steelworks and a Coal Mine, this will allow me to take the rolling stock from the yard at the bottom level and do a little switching.
I have also designed the track plan to allow for trains just to run, when i am not wanting to operate.
So the Construction work begins :-)
No comments:
Post a Comment