Showing posts with label Workshop Construction. Show all posts
Showing posts with label Workshop Construction. Show all posts

Friday, 28 July 2017

Ecos DCC Control Box

So a little building work this week, i need a place to house my Control system, so i found the perfect bit.  I will be use the Mobile app to run my locos, but its here tucked out the way, encase i need to add new Loco's
There is loads of room below for the locos to pass, and you can get to the points ok under there.  So another job done






Monday, 26 June 2017

Lewis Lakes - St. Leonard's Yard

I Managed to get a lot done over the weekend, all the point work for the yard has now been installed and wired up.  I have also fitted the ground throws.  The First 2 yard tracks have been fitted.  I now need to buy 2 RH points and 1 LH point to complete the yard.  And i need to pick up more Ground throws for Caboose Industries.

I also do a lot of model painting, so i have managed to add a shelve to store tools and paints   























For some reason it has taken me ages to workout how to do the ramp down onto the Roundhouse,  But i seem to have it worked out, and the lift out section only has to drop about and inch and a half.

The first lift out section has been complete only 4 more to design, very please with the progress.

Monday, 8 June 2015

Bench work and Wallpaper - On30 Mining

Progress on the workshop.

The walls were papered this weekend to give a better finish, and as half of the building is for a summer house they will have to be painted.


I removed the shelf's i built above the workbench and will replace them with Kitchen wall units,  I will just be buying the framing just now the doors will follow when i have more cash.


I spent ages trying to workout how best to lay my workbenches out, and i have finally settled for this layout.  I hope it gives me enough space to construct my layouts.

So now its just down to buying another worktop, and the base units to go below the worktop.

I have two 600mm wall units to build and install over the next few days,  But before all that i need to paint the Ceiling and walls.

++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

With the workshop progressing nicely i am now thinking about the first layout i am going to build.  I have been hunting around for a track plan and a theme, and found a cracking small 3 foot by 3 foot layout to use as a base.  Its a small mountain mining layout with an inverted figure of 8, There is a small turntable with sidings to the mine and a blacksmiths workshop.  The Scale is On30 and the stock will be Bachman Porters with the mining ore cars and other scratch build wagons.

More to follow on this........

Wednesday, 27 May 2015

Workshop Update

Workshop update.....

Inside of the workshop is sheeted out.  I have mixed PVA with white paint to coat the walls and the ceiling, this should seal the walls before i paper them.




 I built my workbench along the back wall, its 2 feet deep (600mm) and just under 10 feet long (3000mm).  I plan to use this to build the layouts i want to take to shows. I have started to build two storage shelves above.  Below the workbench i will be building more storage space, but i have my new bathroom suite in storage there until i can get it installed in a few weeks.



I am searching the internet just now for ideas on a workstation for me, how to lay it out, and what height to put it at.  First i need to get rid of the bathroom stuff. than i can complete the storage and work space