Showing posts with label St Leonard's Yard. Show all posts
Showing posts with label St Leonard's Yard. Show all posts

Tuesday, 27 June 2017

Lewis Lake - St. Leonard's Yard Track complete

More Track laying last night, I managed to finish off the Yard Track,  Hopefully you can see from the picture to the side i have marked up each track.

Working from Left to right
First track is the Caboose Track, I still have a line to take down towards bottom and add in 2 more points will will take you to the Switcher Sidings and Fueling Stage.
The Next 3 are Storage Sidings for Rolling Stock.
When you come of the Helix and the Train is ready to be broken down they will the come into the Drop Off/ Set Down Sidings to be sort and either put away or moved on to there destination.  This will also be where new Trains are formed ready to be taken away.
The Last line shown is the Main Line, which runs straight through the yard.

To the left of the main line there will be 2 lines installed, these will be Holding lines, once the departing train has been formed up, it will be moved to these lines, ready to be collected by the main loco and taken off for Delivery to which ever Industry they are being sent to.  I have now ran out of Ground Throws and also need a few more points to be able to finish off the bottom level, but its not far away.






Monday, 26 June 2017

Lewis Lakes - St. Leonard's Yard

I Managed to get a lot done over the weekend, all the point work for the yard has now been installed and wired up.  I have also fitted the ground throws.  The First 2 yard tracks have been fitted.  I now need to buy 2 RH points and 1 LH point to complete the yard.  And i need to pick up more Ground throws for Caboose Industries.

I also do a lot of model painting, so i have managed to add a shelve to store tools and paints   























For some reason it has taken me ages to workout how to do the ramp down onto the Roundhouse,  But i seem to have it worked out, and the lift out section only has to drop about and inch and a half.

The first lift out section has been complete only 4 more to design, very please with the progress.

Friday, 23 June 2017

Lewis Lake - Update to the Track Laying

Update on the Progress made so far.


Helix is now complete track wise, i just need to sort the wiring out 


The low level run around now has been fully laid, with the 2 sidings in place,  
Just need to tidy up the wiring


I finally have a clear work space, i plan to put a few shelves between the the 2 levels of base board, to hold paints and tools.



I managed to make a start on the point work that runs across the with as you come out of the yard




All the point work is now installed across the window on the bottom level, the box of drawers will move, and the siding the comes off here will run down to the turntable and roundhouse



I also made a start on the ladder track for the yard.  The Peco code 83 points have two long ties which would foul the track com off onto the yard, to i had to cut them back and swap them to the other side, so i could sit the Ground Throws in place.



Tuesday, 6 June 2017

St. Leonard Yard Track


I wanted to check my Track Spacing and the way i have designed my points to work, so i laid it all out last night to see how it fitted.   
Everything seems to be fitting in OK and i should be able to close the track spacing a bit to allow more space at the front and the back of the yard.






I will have to amended the ladder yard points, I have to cut back the long ties and reattach them to the other side so they don't foul the track.