Now i have manged to build three levels of Base boards structure, i need to start laying track in the hard to reach area's before i board over the top.


The Top picture shows the first piece of point work on the layout, this is coming off level 1 and back onto the Helix to continue up to the next level. The pictures on the left shows the Switch fixed to the tie bars, once i have the track all in place i will be spraying it with Sleeper Grim to dirty it all up. The Switch a good cheap way of operating your points, with over 50 points on this layout, its a lot of motors and point modules to be buying. but as i have said before i feel this gets you more involved with the layout.
From Caboose Industries Webpage
All Caboose Industries ground throws are molded of strong, self-lubricating black Delrin. An external cam provides maximum life and travel for each model. The ingenious design provides a positive lock in both straight and curved directions of throw, effective from 10° above horizontal to the full down position. A detent assists in holding the handle horizontal for installation purposes.
Caboose Industries ground throws are useful in a variety of scales and applications. All Caboose Industries ground throws are available in sprung and rigid configurations.
http://www.cabooseind.com
No comments:
Post a Comment